The Kennedy Companies
About Us
Manufacturer Links
Product List
Locations
Credit Applications
Contact Us
Home
Employment
800.281.8508
         

Ridgewood Water Project

The main engineer was Malcolm Pirnie out of Fairlawn, NJ. Also involved were United Water out of Hackensack, Ridgewood Water Authority, Bristol Babcock, Kelly Patton of Fab-Crete and Bruce Gaenzle of Optimum Controls. Kennedy's Kevin Czerniawski and Kelly Patton worked closely with Malcolm Pirnie to get the vault designed and coordinated with all of the other groups involved. This was a real team effort, as each vendor had specific requirements for the project. The Kennedy-supplied materials include flanged piping, gate valves, water meters, valve controllers, access hatches, manholes, ladders, piping restraints, electrical panel boxes, submersible pumps and much more.

[ Return to List ]